Option: Woojin LogicBox (07A120)

일반

The Code Box allows the creation and configuration of up to four individual programs.
Each program defines logical conditions that control specific outputs.

The function must be enabled via the option page.

Program Structure

Each program consists of:

  • 4 AND conditions
  • Each condition may include an optional OR condition

Note:

  • 그만큼 first input block and the output block are always present and cannot be removed.
  • Additional blocks can be added or removed using the Add 그리고 Delete (drag & drop) functions.
  • If the first block or the output block is deleted or reset, its configuration is automatically restored to the default settings.

Visual Status Indication

The Code Box provides a visual representation of the program state:

  • Blocks change color depending on their status:
    • Disabled
    • Enabled
    • Active
  • A connecting line between the blocks indicates the logical chain:
    • The line color reflects up to which point all conditions are fulfilled
    • This allows a clear visual indication of where the logical chain is interrupted

Block Configuration

Each block can be configured individually.

By clicking on a block, a configuration dialog opens where all relevant parameters can be adjusted.

Available settings include the selection of conditions, logical connections, and output definitions for the respective block.

Conditions

Conditions can be selected from various system signals, including:

  • Digital inputs
  • Mold close
  • Mold position
  • Core 1 IN END
  • Injection pressure
  • Ejector position
  • Carriage forward
  • Motor or heating ON
  • Operating modes
  • and further system signals

Each condition is defined by:

  • a signal (condition source)
  • a comparison operator (=, !=, <, <=, >, >=)
  • a comparison value

The condition becomes true when the selected signal fulfills the defined comparison.

Outputs

Each program can control the following outputs:

  • 알람
  • Digital Outputs
  • Interlocks (Ejector, Injection, Mold)
  • Motor Off
  • Heating Off

Program Management

Each program can be assigned an individual name.
Program names and configurations are warm-start protected.

Programs can be:

  • Disabled globally using a enable checkbox
  • Enabled or disabled individually via checkboxes

Example Program

An example configuration (e.g. a conveyor belt program) can be loaded:

  • Press the “Load Example” button
  • Confirm the action
  • Program 4 will be overwritten and deleted

구독하다
알림
15 댓글
가장 오래된
최신 가장 많이 투표된
인라인 피드백
모든 댓글 보기
Seunghyun Lee
3 months ago

Hello,
We would like to clarify the following points regarding the LogicBox function.
1. I/O Assignment

  • Please confirm whether the input and output signals used in LogicBox are already predefined in the system.
  • Specifically, we need to know:
  • Are Digital Inputs and Outputs automatically mapped?
  • Or is manual assignment required (e.g., via I/O mapping or configuration table)?

2. Option Page Configuration (HMI)

  • Please provide guidance or reference on how the LogicBox option is enabled in the HMI.
  • We need confirmation on:
  • Where the LogicBox option is activated (Option page / Parameter page)
  • Whether any additional configuration is required before using the function
  • If available, please share a screenshot or documentation of the option setting page.

3. Scope of HQ Responsibility
From HQ perspective, we understand the following:

  • HQ will:
  • Use predefined signals for LogicBox configuration
  • Apply logic based on available system signals (Mold, Ejector, Injection, etc.)
  • HQ will NOT:
  • Modify or assign low-level I/O mapping
  • Change system-level signal definitions

Please confirm if this understanding is correct.
4. Additional Request

  • If there is a recommended standard configuration or example use case, please share it.
  • Also, please clarify if there are any limitations or restrictions when using LogicBox.

We need this clarification to ensure proper application and avoid misuse in the field.
Please provide your feedback.
감사합니다,
이승현

Richard Wagner
답변하기  이승현
3 months ago

Yes, pre-defined “user programmable logic-box signals” will be used. similar to “codebox” signal. Standard can be 2 logic-box inputs, and 2 logic-box outputs.

trackback
3 months ago

tadalafil tablet pronunciation

tadalafil tablet pronunciation

trackback
3 months ago

online cialis australia

online cialis australia

trackback
3 months ago

vidalista 20mg india

vidalista 20mg india

trackback
2 months ago

orlistat reviews

orlistat reviews

trackback
2 months ago

rogaine target nearby

rogaine target nearby

trackback
2 months ago

flagyl and breastfeeding safety

flagyl and breastfeeding safety

trackback
2 months ago

metronidazole topical cream 0.75 rosacea

metronidazole topical cream 0.75 rosacea

trackback
1달 전

acyclovir walmart price

acyclovir walmart price

trackback
1달 전

terbinafine dosage breakdown

terbinafine dosage breakdown

trackback
1달 전

ketoconazole shampoo comparison

ketoconazole shampoo comparison

trackback
25 days ago

minoxidil men’s frontal hairline guide

minoxidil men’s frontal hairline guide

trackback
24 days ago

minoxidil pk insights

minoxidil pk insights

trackback
2 hours ago

avanafil price overview page

avanafil price overview page

위로 스크롤
15
0
여러분의 생각을 들려주시면 감사하겠습니다. 댓글로 남겨주세요.엑스